ORSANCO - For our mission, compact and strategic plan and our partnerships with government and industries. River Information - For facts about the Ohio River basin, information on the river's aquatic life and forecast, navigation and weather reports. Water Quality Protection - Information on water pollution control standards for the protection of aquatic life, drinking water and recreational uses of the Ohio River. Community involvement programs to share our water quality protection message with the public and encourage active citizen participation in caring for the Ohio River Basin while spreading the word about ORSANCO and our water quality protection programs.
Home > River Information >Ohio River Facts > Hydropower Impacts
Ohio River Facts

Ohio River Conditions

Request Publications

Other Useful Links

Biennial Assessment of Ohio River Water Quality Conditions
Education
Federal State Agencies
Organizations
Recreation
Water Utilities


Hydropower facilities can have two types of impacts on a river and its resident aquatic life. First, the turbines can cause mortality to fish which pass through the facility. Second, the diversion of river flow through a hydropower facility can prevent the rapid introduction of oxygen which would occur if the water passed over the dam. During low flow periods, aeration at dams is the major source of oxygen to the Ohio River.

The Commission has adopted a policy on hydropower development at Ohio River dams which calls for each developer to conduct studies to determine the level of aeration provided by the dam prior to hydropower construction, to provide capabilities in facility design and operation to replace the aeration capacity when needed to maintain stream dissolved oxygen (DO) levels, and continuous monitoring of DO levels above and below the facility, with results made available to ORSANCO through telemetry in order to allow real time response to adverse conditions. The Federal Energy Regulatory Commission (FERC) has cooperated by placing conditions in new licenses for Ohio River hydropower projects that call for ORSANCO review of facility monitoring plans.

Dissolved oxygen monitors at the existing hydropower facilities, as well as four lock and dam locations operated by the U.S.Corps of Engineers, are interrogated from Commission headquarters on a weekly basis from May through October. If critical conditions begin to develop, interrogations are increased to daily and operators, as well as state and federal agencies, are alerted. If DO levels approach minimum allowable levels, hydropower operators and the Corps are requested to take action to maximize aeration at the dams and thereby increase DO levels. Data from the interrogations are placed on the ORSANCO Electronic Bulletin Board.

Hydroelectric power generation facilities are in place at five Ohio River navigation dams. FERC has granted licenses for hydropower at an additional seven dams and is reviewing applications for projects at five more. Of the remaining three dams on the Ohio, two are due to be replaced by a single new dam now under design. FERC has denied applications for hydropower licenses at one dam due to the potential for adverse environmental impacts. As new hydropower facilities are developed, it is important that procedures to respond to impending water quality problems keep pace. Because the facilities are located at navigation dams operated by the Corps of Engineers, the Corps must play a key role in assuring adequate controls on their impact. Commission staff is working with the Corps to refine procedures now in place for response to low DO levels.